{"id":27846,"date":"2024-04-16T11:08:01","date_gmt":"2024-04-16T11:08:01","guid":{"rendered":"https:\/\/scmwizard.com\/?p=27846"},"modified":"2024-04-16T11:08:01","modified_gmt":"2024-04-16T11:08:01","slug":"field-44c-latest-date-of-shipment","status":"publish","type":"post","link":"https:\/\/scmwizard.com\/field-44c-latest-date-of-shipment\/","title":{"rendered":"Field 44C Latest Date of Shipment in LC"},"content":{"rendered":"

Field 44C Latest Date of Shipment<\/strong> is a conditional field in a letter of credit.<\/p>\n

Either field 44C or 44D (Shipment Period<\/strong>) will be present on the LC but not both.<\/p>\n

According to MT700 Network Validated Rules<\/strong><\/p>\n

C3 Either field 44C or 44D, but not both, may be present (Error code(s): D06).<\/p><\/blockquote>\n

But if the transport documents is not required as per LC (Required documents), then, this field may not be present.<\/strong><\/p>\n

Field 44C (Latest date of shipment) specifies the latest date for loading on board, dispatching, or taking in charge.<\/p>\n

Transport documents will validate this condition and should not pass the date mentioned in the \u201cLatest date of shipment\u201d.<\/p>\n

Transport documents might be \u2013<\/strong><\/p>\n